USER NOTICE:
Covered by the Electronics Privacy Act, 18 U.S.C. Sections 2510-2521, and is legally privileged. This website uses a Tracker Server for those IP addresses visiting this webpage. Images are encrypted with a code source signature. Copying images or content on this website is strictly prohibited.

 

This webpage has been provided in order to offer a quick and easy reference source for viewing the planning exhibits that will explain the LOCATIONS of the featured mechanical elements, and how the PROPOSED REV-#2 development is being considered.

 

This revision (REV-#2) has added four (4) Deck Jets for consideration per request. The positioning of jets are spaced at 4′-0″ O.C. just behind the bond beam at the Pool’s -6″ shallow area. These “Water Feature Devices” have been evenly spaced in between the “Surface Skimmers” and the “No Dive / Depth Markers” in order to not create a conflict with the Building Code guidelines. There are TWO OPTIONS available, OPTION #1 a 5-gpm stream of without the benefit of lighting or OPTION #2 a 10-gpm stream of water that would also have a LED color changing lighting effect.

 

PLEASE ADVICE AS TO THE CHOICE BEING SELECTED

 

PENTAIR MAGIC STREAM DECK JET II (OPTION #1)

 

PENTAIR MAGIC STREAM DECK JET II - OPTION #1

 

PENTAIR LAMINAR JET w/LED LIGHTING (OPTION #2)

 

PENTAIR LAMINAR JET w/LED LIGHTING - OPTION #2

 

Additionally, there are two (2) Silhouette Water Features made by Vortex that have now been selected. The plumbing system will be designed to deliver 25 to 40-gpm per the manufacturer’s specifications. These features do not have a lighting option.

 

SILHOUETTE WATER FEATURE BY VORTEX

PRELIMINARY SWIMMING POOL LAYOUT REV-#2

 

Click on image below to enlarge view, use your Browser’s back-arrow key to return to this page

 

PRELIMINARY SWIMMING POOL LAYOUT REV-#2

 

INSTRUCTIONS

Please review the information and provide directions for any desired changes. One (1) revision has been made inclusive in our original Design Fee Schedule. The Plan has now progressed into revision two “REV-#2 which will require the issuance of a Design Addendum as additional revisions beyond the one (1) made inclusive are considered billable work.
 
If all is “ACCEPTABLE” then respond via email that all is “ACCEPTED” and the project can then move forward as a “FINAL DRAFT” and act as the “BASE PLAN” Layout.

 

Moving forward the “Base Plan” will act as the template for all of the advancing layers.

Aquatic Mechanical Engineering  (800) 766-5259