USER NOTICE:
Covered by the Electronics Privacy Act, 18 U.S.C. Sections 2510-2521, and is legally privileged. This website uses a Tracker Server for those IP addresses visiting this webpage. Images are encrypted with a code source signature. Copying images or content on this website is strictly prohibited.
This webpage has been provided in order to offer a quick and easy reference source for viewing the planning exhibits that will explain the LOCATIONS of the featured mechanical elements, and how the PROPOSED development is being considered.
Click on the pdf.file image below to open, hold your “CTRL”key and use your mouse scroll wheel to magnify image and use your Browser’s back-arrow key to return to this page
P-1-SITE-POOL-LAYOUT-PLAN-11-20-24.pdf
P-1-SITE-POOL-LAYOUT-PLAN-11-20-24.pdf
• P-1-SITE-POOL-LAYOUT-PLAN
SUCTION PIPING DETAIL – 11-20-24
Click on image below to enlarge view, use your Browser’s back-arrow key to return to this page
PRODUCT SPECIFICATION DETAILS
Click on image below to enlarge view, use your Browser’s back-arrow key to return to this page
PRODUCT-SPECIFICATION.pdf
• PRODUCT-SPECIFICATION
PUMP CURVE AND INSTALLATION INSTRUCTIONS
Click on image below to enlarge view, use your Browser’s back-arrow key to return to this page
PUMP CURVE AND INSTALL INSTRUCTIONS.pdf
• PUMP CURVE AND INSTALL INSTRUCTIONS
Each of the numbered assignments refers a required component and the drawing exhibits the intended locations for each. Some of the components assignments exhibited are not in the Design Work Scope of the swimming pool mechanical design as of yet but, they are indicated so that they may be considered and what shall be needed in order to collaborate with the other elements of the proposed construction / installation..
In summery there are assigned item numbers that have been identified at the actual locations. Please use the numbers above to identify the actual locations of each item listed and print a copy of the preliminary plan layout above and then markup the drawing show me any changes to these locations.
Please review the information and provide directions for any desired changes. One (1) revision has been made inclusive in our original Design Fee Schedule. Additional revisions beyond the one (1) made inclusive are considered billable work.