INSTRUCTIONS:

Click on the image below to open the image larger, after opening click again to 2 x enlarge and then scroll with your mouse’s thumb wheel while holding your “Ctrl” key in order to magnify the image larger or smaller, use your browser’s back arrow to return to this webpage.

COMPETITION PLUMBING PLAN w/ RIM FLOW GUTTER SYSTEM REV-3

Preliminary P-1.1 Competition Pool Piping Layout

The plan above provides a six (6) hour turnover plumbing diagram for a 159,500 gallon pool with the following information;

  • 8.00″ Dual 18″ Main Drains (Suction)
  • 6.00″ Bottom Returns (30-Ea)
  • Rim Flow Gutter System (272-LF w/ 10 Catch Basins)

COMPETITION RIM FLOW GUTTER DETAILS A thru E

Competition Pool Rim Flow Gutter Details A thru E

COMPETITION RIM FLOW GUTTER DETAILS F thru T

Competition Pool Rim Flow Gutter Details F thru T

Aquatic Mechanical Engineering  (800) 766-5259