Concept #2

This pool is 32′-0″ x 16′-0″ I.D. shown on the drawing. The pool is sized at 512-SF and 96-PF, as drawn. The bottom depth ranges from 3’6″ in the shallow to 6′-0″ in the deep end.

  • Click HERE to view example of Pool Bottom Contour

There is a -18″ Cabo Shelf abutting the shallow end, together with entry steps and two -18″ Swim-Out Benches adjacent to the deep end Fire Pit.

  • Click HERE to view Custom Benches and Steps

The pool’s water volume is approximently 16,750 gallons, thus requiring a pumping flow rate of 46.50 gpm in order to accomplish Title 24’s energy efficiency guidelines.

  • Click HERE to view pump curve performance

Fire / Water Feature

There are several possibilities regarding the conformity and function of the Fie Pit, including the possibility of combination Fire / Water Feature effects.

  • Click HERE to view a sample Fire Water Feature

Sheer Descent Waterfall

There is a 3′-0″ wide Sheer Descent Waterfall exhibited on plan, which will be placed in the center of the +24″ Raised Bond Beam section.

  • Click HERE to view a sample Sheer Descent Waterfall

Construction Details

The flat-work area has not been determined as of yet but, it will involve 96-LF of pool edge.

The further development of specifications for pouring, placing and finishing a possible concrete “Rat Slab” for the application of topical “Travertine Tile” flat-work and cantilever style edge can establish the criteria for how to accomplish a 1st Class standard. These directions can involve;

Pool Equipment Pad Location

The pool equipment Set-Backs are 5′-0″ as is typical…thus we will need to discuss the placed of the equipment in order to be compliant with clearances.

Raised Bond Beam Sections…

There are (2) two Raised Bond Beam sections (+24″ and +18″). We are assuming that the Sheer Descent Waterfall is to be raised in incremental two steps (+12″ & +24″), together with the Fire Pit to be elevated to +18″.

  • Click HERE to view an example of Raised Bond Beam

Conceptual Imagery…

Click on the image below to view a Conceptual Image of your new pool from this vantage point…

Swimming Pool Concept After Example #1