INSTRUCTIONS:
Click on the image below to open and enlarge, after opening click again to 2 x enlarge and then scroll with your mouse’s thumb wheel while holding your “Ctrl” key in order to magnify the image larger or smaller, use your browser’s back arrow to return to this web-page.
Permit Preparations
The plan listing sheet below exhibits the 1 thru 33 specifics that shall be required by the PLAN CHECKER’S review process. It is important to identify the delegates who shall be responsible for each item in making preparations for your submission.
Click on the image below to open, click twice to enlarge view …
As you are aware the plans must exhibit ALL items listed for the PERMIT PROCESS. Our portion shall deal specifically with the MECHANICAL elements and the other considerations for what is deemed necessary will need to be bundled and collaborated with that information into a submittal package.
The plan below is a REVISED Lower Basin Layout (need elevations) and will need to be corrected in order to accomadate the revised results for the latest structural engineering approach. Please see the Lower Basin’s layout and be sure that the revised engineering results provide for an adequate surface area 3:1 ratio (488-SF / 160-SF).